Introduction
The 600m² single-ply, tapered warm roof system at Nexus Apartments had showed evidence of water ingress from the start. The client were looking for a supplier that could be trusted to find the right flame free solution, that wouldn't require the removal of the existing single-ply membrane and would cause minimum disruption to the residents.
Triflex were invited to provide a project specification proposal for a waterproofing solution to roofs 1, 2, 4 and 6 of the Nexus Apartments in Watford. The existing roof areas were over 600m² and consisted of a single-ply tapered warm roof system on a metal deck which had been installed during the construction of the new build apartments 2 years’ prior.
The client Careys PLC stated that the existing single-ply waterproofing membrane had never provided sufficient waterproofing and showed evidence of water ingress from the start.
The challenge
The Triflex Field Technician team conducted core tests to the roofs to establish the build-up and determine whether moisture was present within the existing insulation.
Peel adhesion tests were also undertaken to ensure a strong bond could be achieved between the single-ply and the Triflex. These tests identify whether any pre-treatment or priming is required prior to the application of the Triflex waterproofing resins. Lastly, a single-ply sample was taken to be tested for 6 weeks in the Triflex Laboratory for plasticiser migration.
Two of the roofs contained numerous PV panels. These roofs required particular consideration to ensure that the replacement waterproofing system would be strong enough to withstand the weight of the panels without puncturing the membrane, in these locations a heavy duty finish would be required. The roof also contained areas which would require intricate detailing, including a party wall, upstands, door thresholds, internal gutters, chute outlets and penetrations.
Careys stated that the proposed solution would need to be flame-free and suitable to directly overlay the existing single-ply. By doing so this would reduce the cost and time of removal, the disruption to residents and ensure that any risks associated with the use of hot works would be completely negated.