Name Sort ascending | Download Type Sort descending | Download |
---|---|---|
Case study |
File
The-Mill-Guernsey-CS.pdf
(5.27 MB)
|
|
Equine facilities require reliable, hard wearing flooring surfaces that are cushioned to protect a horses joints, tendons and shoes while providing an anti-slip finish. That’s where Triflex EquiTerra comes in to its own, as a seamless, cold pour rubber flooring system that is ideal for use in a wide range of equine applications including stables, walkways, wash bays, parade areas, rings and much more. Perfectly suited to forming to any shape, Triflex EquiTerra is fully bonded and will not move or shift when under load or over time. |
System overview |
File
SO Triflex EquiTerra 03-23 EN.pdf
(988.05 KB)
|
Tween Bridge wind farm consists of 22 turbines that, per annum, generate up to 44MW of power, providing 300,000 homes with their annual electricity needs. |
Case study |
File
Abbey Duck Pond -Case Study.pdf
(3.35 MB)
|
Download centre
291
Total Downloads
31-33 of 33 Downloads