| Name Sort descending | Download Type Sort descending | Download | 
|---|---|---|
| Brochure | File Car Park Solutions 02-25.pdf
  (6.46 MB)
 | |
| Maintenance, care and cleaning | ||
| Brochure | ||
| Reservoir roof refurbishment. | Case study | File Reservoir-Roof-CS.pdf
  (5.25 MB)
 | 
| Water treatment works. | Case study | File Water-Treatment-Works-CS.pdf
  (11.55 MB)
 | 
| The existing asphalt roof at the Royal Albert Hall in London required an overlay with particular care to the expansion joints to allow for movement within the building.  | Case study | File Royal Albert Hall case study.pdf
  (6.04 MB)
 | 
| Follmann Chemie corporate social responsibility report. | Certification | File CERT CSR Performance Overview 2020 01-20 EN.pdf
  (108.23 KB)
 | 
| Certification | File DOC-EPD-DBC-20250265-IBP1-EN.pdf
  (1.12 MB)
 | |
| Certification | File DOC-EPD-DBC-20250266-IBP1-EN.pdf
  (1.12 MB)
 | |
| Certification | File DOC-EPD-DBC-20250267-IBP1-EN.pdf
  (1.1 MB)
 | |
| Waterproofing and protection. | Case study | |
| Concrete roof refurbishment. | Case study | File Durdham_Water_Tower.pdf
  (5.09 MB)
 | 
| The residential apartments at Eastland Homes requested a waterproofing and surfacing solution that would include both an insulated element, to improve energy efficiency and a durable waterproofing layer to their cantilever walkways. | Case study | File Eastland Homes- Roof and walkways.pdf
  (2.52 MB)
 | 
| Car park refurbishment due to water ingress. | Case study | File Edinburgh-College-CS.pdf
  (14.52 MB)
 | 
| Waterproofing solution for a stadium roof. | Case study | File Emirates-Stadium-London-CS.pdf
  (9.08 MB)
 | 
Download centre
          313
          Total Downloads
        
          
        16-30 of 324 Downloads
      
    
              
      