Are you looking for a Triflex system? Go to the Triflex system finder.

677 results found

1 - 12
of 677 Results
Reference

Edinburgh College

The top deck of the 25-year-old podium car park at Edinburgh College’s Granton Campus, was extensively cracked with ponding water evident. With concerns about water ingress into the lower level of the car park, causing long-term damage to the structure, action was required.

www.triflex.ie/edinburgh-college
Reference

Gateshead College Baltic Campus

Gateshead College, Baltic Campus is served by a busy 225 space multi-storey car park. Restoration and waterproofing of the car park’s exposed upper decks was required to protect the underlying structure, following failures in the existing coating. To meet funding allocation, the project was required to meet exacting timescales.

www.triflex.ie/gateshead-college-baltic-campus
1 - 12
of 677 Results